|
Can't jog machine with Super Long Board
|
|
10
|
142
|
April 2, 2025
|
|
Can SLB drive a stronger Nema 23 Stepper Motor?
|
|
14
|
862
|
March 15, 2025
|
|
Super Long Board EXT
|
|
3
|
250
|
March 4, 2025
|
|
New user connection problems
|
|
5
|
181
|
February 18, 2025
|
|
GoTo XYZ drives tool straight down into material
|
|
1
|
77
|
February 11, 2025
|
|
Laser Issues (again)
|
|
1
|
79
|
January 29, 2025
|
|
Thinking about purchasing the SLB
|
|
2
|
103
|
January 17, 2025
|
|
Slb motor connector type
|
|
5
|
139
|
December 10, 2024
|
|
Upgrade to SLB laser not working
|
|
4
|
160
|
November 30, 2024
|
|
Laser does not fire in gSender 1.4.10
|
|
22
|
263
|
November 27, 2024
|
|
Building a CNC under qualified over engineered
|
|
2
|
116
|
November 14, 2024
|
|
SLB gSender 1.4.9 grblHAL wont run Spindle and Error 1
|
|
5
|
365
|
November 5, 2024
|
|
Laserbeam not emitting signal to gender version 1.4.9 or light burn! HELP!
|
|
6
|
116
|
November 2, 2024
|
|
My longmill does not hold 0 home
|
|
15
|
241
|
October 31, 2024
|
|
SLB Multi day run
|
|
2
|
108
|
October 22, 2024
|
|
3.3v source and 40 PIN GPIO
|
|
4
|
149
|
October 18, 2024
|
|
System locked on “Alarm (Homing)”
|
|
3
|
127
|
October 9, 2024
|
|
SLB Setup on Custom-built, Non-Sienci, ZYYX CNC Machines
|
|
30
|
636
|
October 2, 2024
|
|
$ setting changes not revert back after SLB power cycle
|
|
6
|
166
|
September 24, 2024
|
|
Y axis jamming when giving coordinates but not while homing or jogging
|
|
1
|
75
|
September 23, 2024
|
|
SLB on Onefinity - Y Axis Steps/MM Issue
|
|
4
|
202
|
September 4, 2024
|
|
Axis travel doesn't match the numbers
|
|
4
|
127
|
August 25, 2024
|
|
Feedback from SuperLongBoard users who installed on
|
|
3
|
150
|
August 22, 2024
|
|
Slb -Connecting
|
|
1
|
65
|
August 22, 2024
|
|
FluidNC on SLB for easy configuration
|
|
3
|
310
|
August 16, 2024
|
|
Help with Y Axis Motors
|
|
2
|
86
|
August 19, 2024
|
|
MK2 48x30 upgrade to SLB issue
|
|
4
|
145
|
August 15, 2024
|
|
Vfd spindle on slb
|
|
3
|
204
|
August 9, 2024
|
|
What is included with SLB
|
|
3
|
120
|
August 9, 2024
|
|
Connection question
|
|
4
|
264
|
August 9, 2024
|